California elimination plan is an essential cog in the management optimal household waste. The elimination plan is part of a coherent renovation of our waste management. We must therefore now gradually organize their management and collectively manage the construction of recovery and treatment infrastructures more respectful of the environment. But if the projects, foreseen by the plan, are first of all part of a national regulatory framework, at the local level, county plans of waste disposal impose constraints in terms of equipment and organization to the municipalities.
The need to take into account technical waste priorities
There are technical emergencies within California due in part to saturation around the year 2000 of the landfill/s which are currently functioning such as the center in irvine, which will be saturated before 2025 and that of Anaheim, which will be saturated at the end of 2020, on the other hand, due to the uncertainty of opening new landfills, caused by the nature of soils which are porous and the morphology of the land.
In accordance with the provisions of the law of California, the State has a plan for the elimination of household and similar waste. Indeed, it is made compulsory by the new regulatory framework resulting from this law, the departmental elimination plan, was drawn up at the end of 2015 under the authority of the governor, which specifies the composition of the departmental commission.
In 2010, the center revolved around 240,000 cubic tons per year, which corresponds to a density of compacted waste at 240,000 t / year. In 2025, the entire area allocated to the landfill will be saturated. An extension will be possible towards the sea over another ten hectares, with the possibility of saving another ten lockers of 200,000 cubic meters, provided that the supervisory authority gives its approval.
Development and formatting of the waste management plan
This commission thus brings together municipalities, counties, the general council, approved dumpster rental associations, activists in favor of environmental protection, representatives of of the State, waste professionals, representatives of the the environment and energy management, as well as consumers interviewed by the Commission according to the subject dealt with. When the State Commission has developed a draft plan, it must submit it for advice to the Council of the state, then the plan is approved by the administrative authority of California.
In view of the deadlines granted and in order to advance the work, it is essential that the Commission determine its work program, the modalities of its operation and establish a rigorous work schedule. The plan steps are as follows:
The Planning Commission validated the inventory of collection and processing, highlighting the strengths and weaknesses and examined the constraints and goals. Also, the main objectives retained by the meeting waste commission lead to encourage the reduction of waste production at source by incentive to compost the organic fraction of household waste at the garden particularly in the heights and isolated areas; seek the complementarity of processing channels (material recovery recyclables, composting, waste incineration); advocate sorting at source and selective collections through options realistic and adapted to constraints and recovery sectors existing, with the objective of separate collection of glass, paper, cardboard boxes and other packaging, with a gradual ramp-up, after validation on test areas.
California dumpster rental
It is important to choose composting and incineration with energy production as basic treatment techniques, for residual materials after selective collection, to define the future organization of the department by maintaining traditional collections at the level of municipalities. By promoting groupings counties for selective collection like the Irvine dumpster rentals initiative, green waste management and processing plants, the region can cover the landfill needs of the ultimate standards for existing sites, particularly at Irvine.
The opening of a Technical Landfill Center from the year 2025 will establish a cost equalization for transfer and treatment and promote job creation. The Planning Commission validated its objectives, taking into account the constraints and existing assets within the State of California. It validated the draft plan and the latter was submitted for opinion to the General Council and from then it was submitted to public inquiry. Then, the waste management planning commission assisted the competent administrative authority to reviewing information relating to its implementation.